• October 23, 2014

U.S. Highway 190 closure postponed until Monday

Print
Font Size:
Default font size
Larger font size

Posted: Friday, September 20, 2013 4:30 am

A planned closure of U.S. Highway 190 today was postponed until Monday because storms are likely today.

Contractors planned to shut down the highway at the Willow Springs Drive bridge for 12 hours while a portion of the bridge is demolished.

The closure will now begin at 7 p.m. Monday, with crews diverting traffic onto frontage roads.

The highway will reopen at 5 a.m. Tuesday.

More about

More about

Rules of Conduct

  • 1 Keep it Clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
  • 2 Don't Threaten or Abuse. Threats of harming another person will not be tolerated. AND PLEASE TURN OFF CAPS LOCK.
  • 3 Be Truthful. Don't knowingly lie about anyone or anything.
  • 4 Be Nice. No racism, sexism or any sort of -ism that is degrading to another person.
  • 5 Be Proactive. Use the 'Report' link on each comment to let us know of abusive posts.
  • 6 Share with Us. We'd love to hear eyewitness accounts, the history behind an article.

Welcome to the discussion.